top of page
PARKWOOD ELEMENTARY CHILLER REPLACEMENT Status - In Design DURHAM, NC
SAMR has contracted with Durham Public Schools for the Parkwood Elementary School, Chiller Replacement Design Project. Project elements included:
-
Replace water-cooled chiller with air-cooled chiller.
-
Replace pumps.
-
Relocate natural gas piping.
-
Design of electrical service to chiller.
-
Grading and retaining wall.
Parkwood Chiller Replacemet
Currently in design
DSC01567_DPS Parkwood Chiller (2)
DSC09125_Good Photo (2)
Parkwood Chiller Replacemet
Currently in design
1/3
CONTACT
MAILING ADDRESS:
610 Pembroke Rd
#41195
Greensboro, NC 27404
dgiles@samrba.com
Tel: 336-988-1769
bottom of page